The City of Rialto will commence the demolition of three structures located in the South Palm/ South Orange avenues area near the Rialto Metrolink Station.
This work will commence with the removal of vegetation (clearing & grubbing), followed by the demolition of three existing structures, and will be completed upon full clean-up of the area.
During demolition activity, the sidewalk area surrounding the buildings will be closed intermittently, as needed. Pedestrians will be re-routed to use the sidewalk on the other side of the street.
Constuction Notice
Mid July - Late September, 2023
English Notice

Spanish Notice